For Plumbers

POWTS Installation

All POWTS, holding tank installations and reconnections require an inspection prior to covering.  Mounds and at-grade systems require soil moisture inspections of both the plowed layer prior to construction, and of the mechanical components before capping or covering.

All inspections require at least a 24 hour notice. Inspections must be called in to (715) 539-1087 before 4:30 PM Central Time the day prior to installation.